| Challenge |
Mainland Britain's first grid connected wind turbine at a school,Cassop Primary School, Cassop,Co. Durham UK
Turnkey Contractor - WINSUND for Durham County Council |
| Existing |
3-phase 415volt supply to School |
| Solution |
An AOC 15/50 wind turbine (rated at 50kW) was chosen by Durham County Council for installation at this site. WINSUND were successful with their Tender to supply,install & commission the wind turbine - including grid connection to Northern Electric's distribution network and G59 compliance. |
| Tech Spec |
-AOC 15/50 wind turbine generator rated at 50kW
- 18.8m (60ft) lattice tower -Wind Turbine Controller with PLC,Soft Start & Grid Monitor Relay
-Civil Works & Cable Laying of main power & control cables (120m)
-Grid Connection and G59 testing & compliance with export/import metering
-Live Time Interactive Display in the School
|
| Photo
Gallery |